Workers at Gas Plant

Renewable Power Generation Project, UK

Completed over 200 Grid connections equating over one Gigawatt of embedded generation for 200MW of Gas generation, 500MW of Battery energy storage,  and 300MW of Wind Power.

Gas Plant

Grimsby Gas Generation, UK 

250MW Engineering, Procurement, and Construction works.  Planned, designed, and managed the EPC works from Point of connection at TSO interface to the balance of plant (BOP), switchgear, and embedded generation equipment

Optimized-GettyImages-995034164.jpg

TEXAS GRID

Specialist Review, Northern America Power Transmission Grid, Texas (ERCOT) Grid

Provide technical support and guidance for review of 230/66/22kV 200MVA Power Transformer technical specifications and factory acceptance test reports  Main objectives includes: to identify any ambiguous/vague requirements in the technical specifications and providing recommendations, verify the necessary tests, test methodologies, setups, parameters and results etc., are in accordance with the contractual requirements,  IEC standards, Employers standards, and to provide recommendations on the correct/expected necessary tests, test methodologies, setups, parameters and results etc., in the event of non-­compliance.

HV-network-XL.jpg

HV CABLE NETWORK, ACCRA

 Cable Network, Accra Wire and Cable Network

Appointed as CNAG Engineers, scope includes; procurement, selection of contractors, site supervision, design review of contractor’s design, environmental and resettlement management, commissioning and defect liability period management for transmission lines, underground cables and substations. This project is funded by private equity funders under the Ministry of Finance of Ghana.

1393169486_Morgan-Marine-Roadside-Feeder

MANCHESTER STREET, UK

Substation design, IPE, Manchester, UK 

Produced  11kV substation and  all associated LV design earthing design and calculation, checking and approval of design drawings, relay configurations, protection settings . Earthing design and calculation works . Reviewed and approved  substation drawings  for final installation.  

Super-Low-Loss-Transformers-By-Powerstar

LYDDEN ROAD, UK

Substation design, IPE, Lydden Road, London, UK 

Produced  11kV substation and  all associated LV design earthing design and calculation, checking and approval of design drawings, relay configurations, protection settings .  Earthing design and calculation works . Reviewed and approved  substation drawings  for final installation.  

case-battersea.jpg

BATTERSEA PARK, UK

Engaged as the Client’s Agent to review and approve the high and low voltage (HV/LV) design, AJET Engineering has poured over every detail, challenging and crystalising information presented as necessary to ensure our client acquires a world class asset.

London-Canary-Wharf-Wood-Wharf-template.

Canary Wharf’s Wood Wharf, UK 

AJET Engineering have been engaged to review the electrical design, ensuring it is fit for purpose and will provide the longevity and security required for our client to meet its’ operational and business objectives. 

Prologis Beddington Image 2_Photo_1_larg

Beddington Lane, Croydon, UK

Produced  11kV substation and  all associated LV design earthing design and calculation, checking and approval of design drawings, relay configurations, protection settings .  Earthing design and calculation works . Reviewed and approved  substation drawings  for final installation.  

14075_Knightsbridge_Sectional_cgi_websiz

Knightsbridge, London, UK 

AJET Engineering have been engaged to review the electrical design, ensuring it is fit for purpose and will provide the longevity and security required for our client to meet its’ operational and business objectives. 